What a bathroom refit really costs — and where the money goes

The Estimo team · Published 3 August 2026 · Last reviewed 3 August 2026

A newly renovated modern bathroom

The short answer

Most UK bathroom refits land somewhere between roughly £3,000 and £16,000 depending on size, spec and how much gets moved. Labour is usually the largest single share; moving the soil pipe or the layout is what turns a mid-range job into an expensive one.

Where the money actually goes

People budget for the suite and the tiles. The bill is mostly labour, preparation and the things nobody photographs.

  • Strip-out and waste — a day or two plus skip costs.
  • First fix plumbing and electrics — the expensive, invisible part.
  • Tanking and preparation — skipping this is the most costly saving you can make.
  • Tiling — driven by area, tile size and pattern, not just tile price.
  • The suite — anything from a few hundred pounds to several thousand.
  • Second fix and finishing — sealing, trims, decoration.

What pushes the price up

  1. Moving the toilet, particularly if the soil pipe has to move.
  2. Changing from a bath to a large walk-in shower with a formed tray.
  3. Underfloor heating, niches and recessed detailing.
  4. Older properties: uneven floors, surprise pipework, asbestos checks.

Where you can genuinely save

  • Keep the layout. Same positions, same pipework, far less labour.
  • Choose a mid-range suite and spend on tiling and fitting quality instead.
  • Buy fittings yourself only if your fitter is happy to work that way.

Common mistakes

  • Budgeting for materials but not the fitting cost, which is often larger.
  • Leaving no contingency for what appears once the floor comes up.
  • Comparing quotes where one includes decoration and the other does not.

Next steps

Write down the layout you want, the spec level you are comfortable with, and a 10-15% contingency. Those three numbers make every quote you receive easier to judge.

Frequently asked questions

How long does a bathroom refit take?
A straightforward refit is typically one to two weeks. Moving the layout or plastering and drying time can extend that.
Should I buy the suite myself?
Often yes for savings, but agree it with your fitter first — many prefer to supply so they carry the warranty.