
The 10-point checklist for comparing any quote
A repeatable way to compare quotes for building work, repairs or services so you are comparing like with like.
11 August 2026
The Estimo team · Published 30 July 2026 · Last reviewed 30 July 2026

Quotes differ mainly because of scope, specification, contingency and how busy the builder is. Before assuming one is a rip-off, line the quotes up item by item — most large gaps come from work that one quote includes and another quietly leaves out.
When people get three quotes for the same job, a spread of 30-60% is completely normal in the UK. The instinct is to assume the highest one is chancing it. Usually something more boring is going on.
Line the quotes up side by side and mark every item that appears in one but not the others. That single exercise explains most of the difference — and gives you something concrete to negotiate on.
Estimo gives indicative, AI-assisted guidance based on the information provided. It is not a formal quotation, valuation, survey or professional advice. Always confirm with a qualified professional before committing money.
Read nextThe 10-point checklist for comparing any quote
A repeatable way to compare quotes for building work, repairs or services so you are comparing like with like.
11 August 2026

Why two extensions of the same size can differ by tens of thousands, and which decisions carry the most weight.
17 August 2026

A breakdown of where your budget actually goes in a bathroom refurbishment, from first fix to the final silicone bead.
3 August 2026